Mining Oridium
Mining oridium is difficult, to say the least. Each prisoner has a quota of 5 kg of oridium per month. Any month where a prisoner does not meet quota is added to his prison sentence. For each 500 grams over 5 kg, the prisoner earns 1 credit that is paid in cash at the end of the month. Working against the inmates is the fact that the scale is deliberately set incorrectly (reduce all totals by 20%).

To mine oridium, the PC makes a skill roll each week (4 weeks in a month). If the roll comes out to success, he has mined 1 kg of oridium that week. For every point below success, he has mined an additional 100 grams of oridium. Thus, if the PC has an 8 or less roll, and rolls a 7 for the week, he has mined 1.1 kg (which is then reduced by 20% for the official scale). For every point above success, he has mined 250 kg less. Thus, if the PC has an 8 or less roll, and rolls a 9 for the week, he still managed to mine 750 grams of oridium.

Characters with a sustainable (no limitations) SPEED of higher than 2, get one additional mining roll per month per point of SPEED above 2. Subtract one bonus roll if the PC must concentrate on other things (such as maintaining life support to protect againt radiation sickness).

Characters working in the Danger Zone can add 2 to their skill roll as oridium is more plentiful down there. However, the Danger Zone has much higher levels of radiation. At the end of every year, each PC must make a CON roll to avoid a permanent -1 to BODY due to prolonged radiation exposure. The CON roll is made at -1 for every 4 weeks spend in the Danger Zone. PCs who are immune to radiation or disease do not need to make this roll.

If should be obvious that the scales are, both literally and figuratively, tipped against the inmates. New inmates are not likely to make quota for quite awhile.

Mining tools can be rented to improve mining ability. By default, all inmates have their belt of mining tools, for which the prision charges a rent of 100 grams of oridium per month. Other tools that can be rented include:

Rock Sapper - +2 to oridium mining roll - 200 grams per month
Mine Thumper - +3 to oridium mining roll - 250 grams per month
Mining Laser - +5 to oridium mining roll - 450 grams per month
Ore Processor - +2 to oridium mining roll and +1 roll per month - 500 grams per month
Oridium Extractor - +4 to oridium mining roll and +1 roll per month - 700 grams per month
Light Excavator - +2 to oridium mining roll and +2 rolls per month - 850 grams per month
Heavy Excavator - +3 to oridium mining roll and +3 rolls per month - 1000 grams per month

Tool rental must be approved by the mining engineer, who usually trusts this task the the chief mining trustee. Anyone who has been at the mine for more than a year can rent a Rock Sapper any time they want. If someone has been at the prison less than a year, but has made quota, then they can also rent a Rock Sapper. Cut offs for renting better tools are as follows. The cut off is after rental costs. Thus, to qualify for a Mine Thumper, an inmate who has been using a Rock Sapper must turn in 6.3 kg (.1 kg rental for normal tools, plus .2 kg rental for the Rock Sapper).

Mine Thumper - 6 kg
Mining Laser - 7 kg
Ore Processor - 7.5 kg
Oridium Extractor - 10 kg
Light Excavator - 12 kg
Heavy Excavator - 14 kg

Once an inmate has qualified for a specific tool, they may keep that tool for as long as they continue to make the qualification cut off. If they miss the qualification cut off for one month, they may also keep the tool but, if they miss it for two months, they drop down to the tool that their new turn in amount qualifies them for.

The rental equipment does not lend itself well to interior inspection. Like the mining lights, the mining tools are sealed units. The big difference between them and the mining lights, is that there is a way to unseal the mining equipment other than breaking the case. However the method of unsealing uses some sort of sophisicated electonic lock. With a proper Security Systems toolkit, you would have a moderate negative modifer (about -3). With no toolkit, it is not possible to open the lock. Using the electronic toolkit would incur a -8 penalty. Mining Tools are turned in at the end of each day and part of the turn-in process is a quick inspection of the device.

Mining Accidents - Whenever a character rolls a natural 17 or 18 while mining, there is a chance of a mining accident from falling rocks.

With a 17, the character must make a DEX roll or suffer 4d6 damage, plus 1d6 per point by which the DEX roll was failed. If the roll is successful, 2d6 damage is taken. If the roll is made by half, no damage is taken.

With an 18, the DEX roll is at -4 and damage is 6d6, plus 2d6 per point of failure. The roll is successful, 4d6 damage is taken. If the roll is made by half, no damage is taken.

Someone with Danger Sense that works out of combat is allowed a Danger Sense roll and, if successful, they avoid the danger by diving out of the way. Otherwise, they must make their DEX rolls.

Character Mining Efforts and Reputation
The table shows what the PC actually mined. The monthly total shows what they actually turned in. The group is free to manipulate the results as long as the total turned in my the group doesn't exceed the total mined by the group.

Oridium Totals Email
Month 22 Mining Totals

Jack - 12080
Max - 4022 (spent first 12 days scanning)
Nobody - 13840
Vamperina - 13100
Curt - 7605 ("escaped" on day 22)
Scooter - 9720 (spent time opening exit)
Dayne - 10800
Arpad - 12240
Surge - 2580 (started on day 13, spent day 27 exploring)
Sam - Working for Chaplain

Let me know what amounts you want to turn in for each person and then I will let you know what tools you will be allowed next month.

Allowed Tools Email
Allowed tools for month 23.

Jack - Mining Laser
Max - Mining Laser
Nobody - Light Excavator
Vamperina - Light Excavator
Scooter - Mining Laser
Dayne - Oridium Extractor
Arpad - Oridium Extractor
Surge - Mining Laser
Curt - Nothing

Is everyone just going to use the tool they were issued?


Jack
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 1
5920
9600
9
Month 2
5240
10100
10
Month 3
6560
9100
8
Month 4
5400
9100
8
Month 5
5840
9800
9
Month 6
7600
9750
11
Month 7
8160
8950
9
Month 8
6840
8550
8
Month 9
7360
10150
12
Month 10
8720
10750
13
Month 11
6240
10350
12
Month 12
10400
13550
20
Month 13
9840
12600
17
Month 14
7920
12600
17
MML
Month 15
10720
13550
19
DZ (+G)
Oridium Extractor
Month 16
10640
14750
22
DZ (+G)
Oridium Extractor
Month 17
10000
8100
5
MML (+G)
Oridium Extractor
Month 18
9680
7700
4
MML
Heavy Excavator
Month 19
12640
7700
4
MML (+G)
Heavy Excavator
Month 20
13020
8500
6
MML
Heavy Excavator
Month 21
9680
9680
9
DZ (+G)
Rock Sapper
Month 22
12080
11355
34
DZ (+G)
Mining Laser
Month 23
Month 24
Max
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 1
1880
2000
0
Month 2
3160
2700
0
Month 3
4960
2300
0
Month 4
5360
2266
0
Month 5
3200
3034
0
Month 6
5280
3004
0
Month 7
6000
5214
0
Month 8
5600
5446
0
Month 9
4240
5500
0
Month 10
6240
6500
3
Month 11
3320
6100
2
Month 12
6800
8500
8
Month 13
5840
8950
9
Month 14
3360
9150
9
MML
Month 15
9040
9150
9
DZ (+G)
Oridium Extractor
Month 16
8400
8750
8
DZ (+G)
Oridium Extractor
Month 17
6080
9150
8
MML (+G)
Mining Laser
Month 18
8040
8500
6
MML
Heavy Excavator
Month 19
9360
8900
7
MML (+G)
Heavy Excavator
Month 20
9520
8900
7
MML
Heavy Excavator
Month 21
1040
6240
1
DZ (+G)
Rock Sapper
Month 22
4022
7089
4
DZ (+G)
Rock Sapper
Month 23
Month 24
Nobody
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 1
7280
2000
0
Month 2
7680
2700
0
Month 3
7440
2600
0
Month 4
8400
2800
0
Month 5
7560
3400
0
Month 6
7120
2600
0
Month 7
7360
2600
0
Month 8
5400
2600
0
Month 9
8240
2700
0
Month 10
12160
3000
0
Month 11
11920
2700
0
Month 12
12240
3100
0
Month 13
11600
3300
0
Month 14
10480
3400
0
Month 15
5500
5500
0
None
MML (training)
Month 16
7713
7713
0
None
MML (training)
Month 17
12480
7950
6
MML (+G)
Light Excavator
Month 18
14540
10100
10
MML
Heavy Excavator
Month 19
14480
10100
10
MML (+G)
Heavy Excavator
Month 20
13280
10500
11
MML
Heavy Excavator
Month 21
8240
8240
5
DZ (+G)
Oridium Extractor
Month 22
13840
13010
68
DZ (+G)
Oridium Extractor
Month 23
Month 24
Surge
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 1
4280
2000
0
Month 2
5320
2700
0
Month 3
5040
11300
12
Month 4
2960
9800
9
Month 5
5120
10850
11
Month 6
4040
10150
12
Month 7
3600
9550
10
Month 8
5200
9550
10
Month 9
3720
9950
11
Month 10
4200
15550
25
Month 11
2600
12600
17
Month 12
5360
13000
18
Month 13
3680
11550
15
Month 14
Machine Shop
Month 15
Machine Shop
Month 16
Machine Shop
Month 17
Machine Shop
Month 18
Machine Shop
Month 19
Machine Shop
Month 20
Machine Shop
Month 21
Machine Shop
Month 22
2580
3750
0
Month 23
Month 24
Vamperina
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 1
5920
2000
0
Month 2
6720
2800
0
Month 3
7560
2300
0
Month 4
7920
2700
0
Month 5
7600
3350
0
Month 6
6640
5100
0
Month 7
8640
5100
0
Month 8
8640
5700
1
Month 9
11520
6500
3
Month 10
12800
8500
8
Month 11
10480
7350
5
Month 12
12560
8550
8
Month 13
12800
7750
6
Month 14
11040
8350
7
MML
Month 15
12400
10200
11
DZ (+G)
Mining Laser
Month 16
11520
9400
9
DZ (+G)
Oridium Extractor
Month 17
13840
9300
8
MML (+G)
Heavy Excavator
Month 18
12000
8500
6
MML
Heavy Excavator
Month 19
14080
8900
7
MML (+G)
Heavy Excavator
Month 20
11880
8900
7
MML
Heavy Excavator
Month 21
10400
10400
11
DZ (+G)
Rock Sapper
Month 22
13100
12314
36
DZ (+G)
Oridium Extractor
Month 23
Month 24
Curt Rustle
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 1
2800
10100
10
Month 2
3920
10600
11
Month 3
5680
9100
8
Month 4
5520
8614
7
Month 5
8160
8326
6
Month 6
6800
9076
9
Month 7
8000
8786
8
Month 8
9520
9674
10
Month 9
9600
6753
3
Month 10
9280
7600
5
Month 11
11200
7150
4
Month 12
10320
8750
8
Month 13
10240
8350
7
Month 14
10400
8350
7
MML
Month 15
11920
10200
11
DZ (+G)
Light Excavator
Month 16
11520
9400
9
DZ (+G)
Light Excavator
Month 17
11920
9300
8
MML (+G)
Heavy Excavator
Month 18
10877
8500
6
MML
Heavy Excavator
Month 19
11520
8900
7
MML (+G)
Heavy Excavator
Month 20
13800
8900
7
MML
Heavy Excavator
Month 21
8560
8560
7
DZ/MML (+G)
Rock Sapper
Month 22
7605
7149
0
DZ (+G)
Mining Laser
Month 23
Month 24
Scooter
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 4
7400
7400
4
Month 5
8160
8300
6
Month 6
7760
8550
8
Month 7
5600
7350
5
Month 8
8240
7350
5
Month 9
8640
10150
12
Month 10
9360
10750
13
Month 11
9840
9150
9
Month 12
8960
9150
9
Month 13
In hospital
Month 14
8560
8350
7
MML
Month 15
12000
10200
11
DZ (+G)
Oridium Extractor
Month 16
11120
9400
9
DZ (+G)
Oridium Extractor
Month 17
12560
9300
8
MML (+G)
Heavy Excavator
Month 18
10029
8500
6
MML
Heavy Excavator
Month 19
11840
8900
7
MML (+G)
Heavy Excavator
Month 20
11120
8900
7
MML
Heavy Excavator
Month 21
5680
8520
6
DZ (+G)
Rock Sapper
Month 22
9720
10964
33
DZ (+G)
Mining Laser
Month 23
Month 24
Dayne Fred
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 4
6640
6640
3
Month 5
8240
8240
5
Month 6
7760
7350
5
Month 7
7120
6550
4
Month 8
7360
6550
3
Month 9
7600
7350
5
Month 10
10480
10150
12
Month 11
9600
9200
9
Month 12
11200
13200
19
Month 13
11200
12200
16
Month 14
10240
11430
14
MML
Month 15
11280
13150
18
DZ (+G)
Light Excavator
Month 16
12240
13150
18
DZ (+G)
Light Excavator
Month 17
13120
10500
11
MML (+G)
Heavy Excavator
Month 18
12080
9700
9
MML
Heavy Excavator
Month 19
12880
9700
9
MML (+G)
Heavy Excavator
Month 20
14480
9700
9
MML
Heavy Excavator
Month 21
9200
9200
8
DZ (+G)
Rock Sapper
Month 22
10800
10152
31
DZ (+G)
Ore Processor
Month 23
Month 24
Arpd Nisha
Oridium Mined
(grams)
Oridium Turned In
(grams)
Credits Earned
Location Mined
(+G for Max Geology)
Tool Used
Month 14
7920
7920
7
MML
Month 15
10480
10480
12
DZ (+G)
Mining Laser
Month 16
10480
10480
12
DZ (+G)
Mining Laser
Month 17
14800
9400
9
MML (+G)
Heavy Excavator
Month 18
12480
8500
6
MML
Heavy Excavator
Month 19
14480
8900
7
MML (+G)
Heavy Excavator
Month 20
13520
8900
7
MML
Heavy Excavator
Month 21
10320
10320
11
DZ (+G)
Rock Sapper
Month 22
12240
11506
34
DZ (+G)
Oridium Extractor
Month 23
Month 24
Gray Mantra (Ray)
Oridium Mined (grams)
Turned In
(grams)
Credits Earned
Month 10
2230
2000
0
Month 11
1040
1900
0
Month 12
2920
2100
0
Month 13
1880
1880
0
Month 14
1600
2000
0
PCs Involved:Curt Rustle, Jack, Max, Nobody, Surge, Vamperina
File Attachments: